
Kingsway Road Reconstruction & Watermain Upgrade
The City of Welland is completing the designs for the Kingsway Road Reconstruction and Watermain Upgrade project. The project area has been split into two areas: Kingsway from St. Clair Drive (Rail) to Erie Street, and Kingsway from 80 metres south of Forks Road to Talbot Avenue. Construction is planned for 2025. Please see below for a description of the proposed works in each area. Additional information can be found within the presentation located in the Document Library.
Kingsway - St. Clair Drive (Rail) to Erie Street
- Replace and upsize the existing watermain from Erie Street to St. Clair Drive
- Replace water services from the new watermain to the property line, including new curb stops
- Replace hydrants
- Upgrade the existing storm sewer system from Erie Street to St. Clair Drive, including a new storm sewer outlet, catch basins, and drainage improvements
- Reconstruct the full road from Erie Street to the rail crossing including new sidewalks, curb, and gutter
- Add on street parking on Erie Street
- A new pedestrian crossing on Kingsway at Erie Street
- Improve street lighting from Erie Street to St. Clair Drive
- Improve the railway crossing
Kingsway - 80m South of Forks Road to Talbot Avenue
- Replace and upsize the existing watermain from 80 metres south of Forks Road to Talbot Avenue
- Replace all water services from the new watermain to the property line, including new curb stops
- Replace hydrants
- Trench repair and surface restoration
- Asphalt resurfacing in the disturbed lane (northbound lane)
Ask us your questions
I’m just curious who’s been awarded the contract for this work and the timeframe of start to completion.