The City of Welland is undertaking a road reconstruction program along Lincoln Street, Patricia Avenue, and Ascot Court. The proposed upgrades will include: a new asphalt surface, curb replacement, watermain and service replacement, and sidewalk replacement on Lincoln Street and Ascot Court.
Construction Limits
- Lincoln Street - Wellington Street to east limit
- Patricia Avenue - Thorold Road to north limit
- Ascot Court - Chapel Hill Crescent to north limit
Construction
- New granular road base and asphalt surface
- Catch basin repair and replacement including road sub-drain
- New curb and gutter replacement
- Rehabilitation and replacement of sidewalks
- Watermain and water service replacement
Traffic Disruptions
- One-way traffic with flag persons through the construction zones when permissible (minor periods of road closures may be required throughout construction)
- Open to two-way traffic nightly and on weekends/holidays when permissible
Impacts to Private Property
- Topsoil and sod to be reinstated where disturbed due to construction activities
- Driveway closures required for construction will be communicated in advance to affected property owners
- Driveways that have been disturbed due to construction will be reinstated to match the existing material
Next Steps
- Construction activities will occur from August 2025 to May 2026
Where are we on the public participation spectrum?