The City of Welland is undertaking a road reconstruction program along Lincoln Street, Patricia Avenue, and Ascot Court. The proposed upgrades will include: a new asphalt surface, curb replacement, watermain and service replacement, and sidewalk replacement on Lincoln Street and Ascot Court.

Construction Limits

  • Lincoln Street - Wellington Street to east limit
  • Patricia Avenue - Thorold Road to north limit
  • Ascot Court - Chapel Hill Crescent to north limit

Construction

  • New granular road base and asphalt surface
  • Catch basin repair and replacement including road sub-drain
  • New curb and gutter replacement
  • Rehabilitation and replacement of sidewalks
  • Watermain and water service replacement

Traffic Disruptions

  • One-way traffic with flag persons through the construction zones when permissible (minor periods of road closures may be required throughout construction)
  • Open to two-way traffic nightly and on weekends/holidays when permissible

Impacts to Private Property

  • Topsoil and sod to be reinstated where disturbed due to construction activities
  • Driveway closures required for construction will be communicated in advance to affected property owners
  • Driveways that have been disturbed due to construction will be reinstated to match the existing material

Next Steps

  • Construction activities will occur from August 2025 to May 2026