2022 Road Reconstruction 1

Share 2022 Road Reconstruction 1 on Facebook Share 2022 Road Reconstruction 1 on Twitter Share 2022 Road Reconstruction 1 on Linkedin Email 2022 Road Reconstruction 1 link

Consultation has concluded

Subject to Council approval, the City of Welland will undertake a road reconstruction program along Whiteoak Crescent, Aspen Court, St. George Street, Meadowvale Place, Larchwood Circle, and Northwood Drive. The proposed upgrades will include a new asphalt surface, curb replacement, and sidewalk replacement.

Construction

  • New granular road base.
  • Catchbasin repair and replacement, including road sub-drain.
  • New curb and gutter replacement along with the urbanization of Coventry Road.
  • Rehabilitation and replacement of sidewalks.

Traffic Disruptions

  • One-way traffic with flag persons through the construction zones when permissible (minor periods of road closures may be required throughout construction).
  • Open to two-way traffic at night and on weekends/holidays when permissible.

Impacts on Private Property

  • Topsoil and sod to be reinstated were disturbed due to construction activities.
  • Driveway closures will be required during concrete works and while curing. Advance notice to be provided to affected properties.
  • Driveways that have been disturbed due to the construction will be reinstated to match existing material.

Next Steps

  • This project is currently in the tender stage, pending Council approval. Construction is anticipated to start in August 2022.
  • Further notifications will be provided to affected properties before construction.

Subject to Council approval, the City of Welland will undertake a road reconstruction program along Whiteoak Crescent, Aspen Court, St. George Street, Meadowvale Place, Larchwood Circle, and Northwood Drive. The proposed upgrades will include a new asphalt surface, curb replacement, and sidewalk replacement.

Construction

  • New granular road base.
  • Catchbasin repair and replacement, including road sub-drain.
  • New curb and gutter replacement along with the urbanization of Coventry Road.
  • Rehabilitation and replacement of sidewalks.

Traffic Disruptions

  • One-way traffic with flag persons through the construction zones when permissible (minor periods of road closures may be required throughout construction).
  • Open to two-way traffic at night and on weekends/holidays when permissible.

Impacts on Private Property

  • Topsoil and sod to be reinstated were disturbed due to construction activities.
  • Driveway closures will be required during concrete works and while curing. Advance notice to be provided to affected properties.
  • Driveways that have been disturbed due to the construction will be reinstated to match existing material.

Next Steps

  • This project is currently in the tender stage, pending Council approval. Construction is anticipated to start in August 2022.
  • Further notifications will be provided to affected properties before construction.