2024 Road Resurfacing

Share 2024 Road Resurfacing on Facebook Share 2024 Road Resurfacing on Twitter Share 2024 Road Resurfacing on Linkedin Email 2024 Road Resurfacing link

The City of Welland is undertaking a road resurfacing program along Goodwillie Drive, Wellandvalle Drive, Promenade Richelieu, Tanguay Avenue, River Road, Brown Road, and Seaway Drive. The proposed upgrades will include: a new asphalt surface, curb replacement, and sidewalk replacement.

Construction

  • Full-width asphalt milling
  • Full-width asphalt paving
  • Curb repairs
  • Rehabilitation and replacement of sidewalks

Traffic Disruptions

  • One-way traffic with flag persons through the construction zones when permissible (minor periods of road closures may be required throughout construction)
  • Open to two-way traffic nightly and on weekends/holidays when permissible

Impacts to Private Property

  • Topsoil and sod to be reinstated where disturbed due to construction activities
  • Driveway closures required for construction will be communicated in advance to affected property owners
  • Driveways that have been disturbed due to construction will be reinstated to match the existing material

Next Steps

  • Construction is anticipated to begin July 2024

The City of Welland is undertaking a road resurfacing program along Goodwillie Drive, Wellandvalle Drive, Promenade Richelieu, Tanguay Avenue, River Road, Brown Road, and Seaway Drive. The proposed upgrades will include: a new asphalt surface, curb replacement, and sidewalk replacement.

Construction

  • Full-width asphalt milling
  • Full-width asphalt paving
  • Curb repairs
  • Rehabilitation and replacement of sidewalks

Traffic Disruptions

  • One-way traffic with flag persons through the construction zones when permissible (minor periods of road closures may be required throughout construction)
  • Open to two-way traffic nightly and on weekends/holidays when permissible

Impacts to Private Property

  • Topsoil and sod to be reinstated where disturbed due to construction activities
  • Driveway closures required for construction will be communicated in advance to affected property owners
  • Driveways that have been disturbed due to construction will be reinstated to match the existing material

Next Steps

  • Construction is anticipated to begin July 2024
Share Goodwillie Drive, Wellandvale Drive, Promenade Richelieu, Tanguay Avenue, River Road, Brown Road, Seaway Drive on Facebook Share Goodwillie Drive, Wellandvale Drive, Promenade Richelieu, Tanguay Avenue, River Road, Brown Road, Seaway Drive on Twitter Share Goodwillie Drive, Wellandvale Drive, Promenade Richelieu, Tanguay Avenue, River Road, Brown Road, Seaway Drive on Linkedin Email Goodwillie Drive, Wellandvale Drive, Promenade Richelieu, Tanguay Avenue, River Road, Brown Road, Seaway Drive link

Goodwillie Drive, Wellandvale Drive, Promenade Richelieu, Tanguay Avenue, River Road, Brown Road, Seaway Drive

5 months

Page published: 27 Jun 2024, 06:59 AM